September 2025 brought continued attention to water system monitoring, infrastructure repairs, and preparations for colder weather. Water production in Meadow Village was approximately 20% higher than in September 2024, while Mountain Village production declined slightly. Nearly 59,000 feet of sewer lines were cleaned and inspected with cameras, helping identify locations where unwanted water was entering the sewer system. Crews repaired one of those problem areas at White Otter and fixed a main break on the golf course. Staff also continued routine water quality sampling, began deploying well-monitoring equipment, and checked booster stations and other facilities ahead of winter. These efforts reflect the District’s ongoing commitment to reliable service, responsible water management, and proactive care of Big Sky’s infrastructure.